Skip to main content
District

2020 Bond

Centennial School District - 2020 Bond

 

2020 Bond


On May 19, 2020, voters in the Centennial School District approved a $65 million bond, requiring a tax rate of $1.19 per $1000 of assessed property value for bond repayment. Click here to view the ballot measure.

Since the measure was approved, the school district received a matching grant of $7,464,690 from the state. A simple majority was required for the approval of Measure 26-208. The school district will have paid off older bond obligations before these bonds are issued. This means that the property tax to repay the bonds will not increase the existing rate of $1.19 per $1000 of assessed property value. 

 

 

Background: Proposed Bond Projects


The Centennial School District 28J proposed the following projects to be funded by the bond:

  • Repairing and replacing roofs, boilers, foundations, windows and flooring, and other school facility improvements;
  • Upgrading school safety and security systems;
  • Adding gymnasiums to four schools without dedicated gyms; and
  • Repurposing Oliver Elementary back into a middle school, including library, science, locker rooms, and career and technical improvements. 

 

 

Visit Our 2020 Bond Updates Blog


Progress of 2020 bond projects can be found on our 2020 Bond Updates blog.

Centennial School District - Click here to see our 2020 Bond Updates Blog!

 

 

Projects for Each School


Click on each of the schools below to see what projects were completed thanks to the community's support of the 2020 Bond.

    • Safety and security: expanded camera system, new and enhanced intrusion alarms, upgraded IT infrastructure
    • Mechanical repairs and enhancements, including boiler replacement and added digital controls system for energy efficiency and diagnostics
    • Roof and gutter repairs 
    • Exterior painting 
    • Safety & security: new intercom system, access controls, updated and expanded camera system, new and enhanced intrusion alarms, new main entry security vestibule, improved exterior lighting, upgraded IT infrastructure
    • Refinished main gym: wood floors stripped, sanded, repaired, sealed, and striped; striping features a large center court Eagles logo
    • Pool renovations: deck repairs, shell rebuild, plumbing system replacement
    • Heating system repairs, replacement of units no longer serviceable, and added digital controls system for energy efficiency and diagnostics 
    • Replaced or repaired approximately 150,000 square feet of the school’s roofing 
    • Stormwater drainage improvements
    • Replacement of six (6) tennis courts 
    • Resurfaced track 
    • New locker room flooring
    • Two new single user restrooms
    • Safety and security: new main entry security vestibule, intercom replacement, expanded camera system, new and enhanced intrusion alarms, upgraded IT infrastructure, enhanced exterior lighting
    • Nine (9) new science labs 
    • Media center renovation 
    • Extensive ceiling repairs
    • Ventilation and mechanical improvements, including air conditioning in the two-story classroom wing and the addition of a digital controls system for energy efficiency and diagnostics
    • Energy-efficient lighting upgrade in science classrooms, media center, and all corridors
    • Extensive roof repairs
    • Siding replacement on the two-story classroom wing
    • Corridor improvements including floor tile removal and polishing of concrete floors and wainscot wall protection
    • New paint on upper walls and doors
    • Three refurbished gym floors: stripped, sanded, sealed, and striped 
    • Resurfaced track and field event areas, stormwater drainage improvements around track and center of field 
    • Locker room updates
       
    • New gym and expanded playground equipment
    • Safety and security: new main entry security vestibule, expanded camera system, new and enhanced intrusion alarms, upgraded IT infrastructure, upgraded fire alarm system, exterior lighting improvements
    • Mechanical improvements including digital controls system for energy efficiency and diagnostics
    • Extensive roof repairs
    • Window repairs
    • Energy-efficient lighting upgrades 
    • Floor tile removal and polishing of concrete floors in corridors and cafeteria
    • Stormwater drainage improvements
    • Upgrade of main electrical service 
    • Safety and security: upgraded fire alarm system, front office reconfiguration to improve lines of sight and safety, intercom replacement, expanded camera system, new and enhanced intrusion alarms, upgraded IT infrastructure, enhanced exterior lighting
    • Three (3) new science labs
    • Media center renovation
    • Two (2) new career technical classrooms
    • Extensive roof repair and replacement 
    • Ventilation and heating improvements including steam trap and boiler repairs, improved control heat distribution throughout the school, added digital controls system for energy efficiency and diagnostics
    • Seismic improvements
    • Refinished upper gym floor: stripped, sanded, sealed, and striped 
    • Corridor improvements including floor tile removal, polishing of concrete floors, wall coverings, wainscoting and painting of upper walls and doors, ceiling repairs
    • Energy-efficient lighting upgrade in science classrooms, media center, and all corridors
    • Solar paneling
    • Middle school furnishings
    • Track replacement, field event areas resurfaced
    • Improved stormwater drainage around track and center field, irrigation added to center of field for improved playability and maintenance
    • Locker room improvements to support middle school programming
       
    • New gym and expanded playground equipment
    • Safety and security: Upgraded fire alarm system, expanded camera system, new and enhanced intrusion alarms, upgraded IT infrastructure, exterior lighting improvements
    • Mechanical improvements including digital controls system for energy efficiency and diagnostics
    • Extensive roof repairs
    • Energy-efficient lighting upgrades
    • Floor tile removal and polishing of concrete floors in corridors and cafeteria
    • Asbestos abatement and new ceilings in all corridors
    • Exterior painting
    • New master clock system
    • Upgrade of main electrical service
    • Improved ADA accessibility at public sidewalks
    • New gym and expanded playground equipment
    • Safety and security: new main entry security vestibule, upgraded fire alarm system, new intercom, expanded camera system, new and enhanced intrusion alarms, upgraded IT infrastructure, exterior lighting improvements
    • Mechanical improvements including digital controls system for energy efficiency and diagnostics
    • Extensive roof repairs
    • Energy-efficient lighting upgrades 
    • Floor tile removal and polishing of concrete floors in corridors and the cafeteria
    • Asbestos abatement and new ceilings in all corridors
    • Stormwater drainage improvements
    • New main parking lot
    • Improved ADA accessibility at public sidewalks
    • Safety and security: new main entry security vestibule,new intercom, expanded camera system, new and enhanced intrusion alarms, upgraded IT infrastructure, exterior lighting improvements
    • Mechanical repairs including digital controls system for energy efficiency and diagnostics
    • Extensive roof repairs
    • Energy-efficient lighting upgrades throughout the school 
    • Exterior door repairs
    • New flooring throughout building (classrooms, front office spaces, and media center)
    • Refinished gym floor
    • Storm drainage system replacement
    • New ADA accessibility ramp to main level
       
    • New gym and covered play area
    • Safety and security: new main entry security vestibule, upgraded fire alarm system, new intercom, expanded camera system, new and enhanced intrusion alarm, upgraded IT infrastructure, exterior lighting improvements, exterior fencing 
    • Mechanical repairs including digital controls system for energy efficiency and diagnostics
    • Extensive roof repairs
    • Energy-efficient lighting upgrades
    • Floor tile removal and polishing of concrete floors in corridors and cafeteria 
    • Stormwater drainage improvements
    • Upgrade of main electrical service